top of page

Subiaco office and apartment block maintenance project

  • Apr 29, 2020
  • 1 min read

Conspar has carried out structural maintenance works to a block of residential apartments and offices in Subiaco.

  • Restoration works needed at this Subiaco office and residential block, predominately associated with water ingress issues
  • Concrete cancer to the undercover carpark of this block of residential apartment and offices in Subiaco
  • Concrete cancer to the undercover carpark of this block of residential apartment and offices in Subiaco
  • Concrete cancer to the undercover carpark of this block of residential apartment and offices in Subiaco
  • Inadequate waterproofing has led to floor damage at this Subiaco residential and office block
  • Inadequate waterproofing at this Subiaco residential and office block
  • Wall damage at the rear of this block of office units and residential apartments in Subiaco
  • This office and residential complex in Subiaco is in need of structural building repairs
  • This office and residential complex in Subiaco is in need of structural building repairs

The works involved structural and surface repair to the front and rear of the multi-functional property - the majority of which was due to the development of water ingress problems.

  • Conspar waterproofing works start at this multi-storey office and residential block in Subiaco. The first stage is removing the former waterproof membrane that was inadequate, as seen here at the front of the building.
  • Conspar waterproofing works start at this multi-storey office and residential block in Subiaco. The first stage is removing the former waterproof membrane that was inadequate, as seen here at the front of the building.
  • Conspar waterproofing works at this multi-storey office and residential block in Subiaco.
  • Conspar waterproofing works at this multi-storey office and residential block in Subiaco. The first stage is removing the former waterproof membrane that was inadequate, as seen here at the rear of the building.
  • Conspar waterproofing works at this multi-storey office and residential block in Subiaco. The original waterproof membrane was inadequate and removed, as well as the screed, as seen here at the rear of the building.
  • Wall repair and render reinstatement at the rear of this multi-storey office and residential block in Subiaco.
  • The floor surface of this office and residential complex has been waterproofed to stop the development of concrete cancer in the surface below located at the building's undercover carpark
  • The floor surface of this office and residential complex has been waterproofed to stop the development of concrete cancer in the surface below located at the building's undercover carpark
  • The floor surface of this office and residential complex has been waterproofed and re-tiled to stop the development of concrete cancer

Conspar works to the property included waterproofing of external floors and walls (including limestone retaining walls) which involved the removal of the original render, tiles, waterproof membrane and screed substrate and the installation of a new screed substrate, waterproof membrane (including for drainage areas and at wall junctions) and tiles, repair of drummy and fractured render and reinstatement, as well as the installation of expansion joints and flashing detail.

  • Conspar restoration works to the front of this office and apartment building complex in Subiaco has involved removal of previous floor surfaces, waterproofing, re-tiling and installation of expansive joints
  • Conspar restoration works to the front of this office and apartment building complex in Subiaco has involved removal of previous floor surfaces, waterproofing, re-tiling and installation of expansion joints
  • Conspar restoration works to the front of this office and apartment building complex in Subiaco has involved removal of previous floor surfaces, waterproofing, re-tiling and installation of expansion joints
  • Conspar restoration works to the wall at the rear of this office and apartment building complex in Subiaco has involved removal of the original render, waterproofing, render reinstatement and new capping
  • Newly-tiled and waterproofed floors and walls to the rear of this office and apartment block building in Subiaco
  • Newly-tiled and waterproofed floors and walls to the front and rear of this office and apartment block building in Subiaco

 
 
 

Recent Posts

See All

Comments


bottom of page